Housing 38 rue Cavé – Paris (FR)

The aim of the project is the comprehensive refurbishment, in an occupied environment, of the communal areas of a block of flats built at the end of the 19th / beginning of the 20th century. The general condition of the commun areas is average to dilapidated. The only service room proposed is the 3.6m² garbage shed in the largest courtyard. We propose deconstructing the existing garbage shed and building a new one at the back of the courtyard. For our first research hypothesis, we propose installing the lift shaft in the bathrooms of stack D (located next to the staircase). In terms of the issues at stake, the structural problem is paramount. It’s a very interesting project, with a certain complexity and architectural potential to be taken up.

Refurbishment of a 22 social housing units building – RIVP – Paris 2024

RETHINK (representative)
Call for tenders
Study phase (DIAG)
Surface: 22 flats
Building costs BT: 1,9 M€
Construction time: –
Completion: –
Client: RIVP
13 avenue de la Porte d’Italie, 75013 Paris
Location: 38 rue Cavé, 75018 paris
Program: Rehabilitation of an apartment building
Mission: Basic mission
Download the project sheet >